<i id="5pnlx"></i><u id="5pnlx"><video id="5pnlx"></video></u>

<i id="5pnlx"><video id="5pnlx"><ins id="5pnlx"></ins></video></i><i id="5pnlx"><video id="5pnlx"></video></i>

<acronym id="5pnlx"><video id="5pnlx"></video></acronym>

<i id="5pnlx"></i>

CONTACT US

13770259688

Dongtai Fu De Machinery Co., Ltd.
Address:No. 16 Zhenxing Road, Dongtai Development Zone
Telephone:+86.0515-88102095
Mobile:+86.013770259688
Website:www.sellwiththeshamrock.com
Email:ldyc@sina.com
Industry information

Your current location:Home > Industry information

  • Application and maintenance of pile hammer(9)
  • 2018/3/19¡¡Times of reading:[877]
  • Large penetration of piles

    Pile penetration speed is too fast, will make the top and bottom piston collision quickly separation, combustion chamber compressed air temperature and pressure can not be maintained to make diesel ignition explosion.

    Methods of elimination:

    Put the fuel pump in zero gear, lift the upper piston, drill several times until the penetration of the pile is within the normal range, the pile hammer can start normally.

Copyright:Dongtai Fu De Machinery Co., Ltd.¡¡Telephone:+86.013770259688¡¡Record number:Su ICP 18011909.¡¡Technical support:Sike Network
Telephone:+86.0515-88102095¡¡Website:www.fdmachine.com¡¡Email:ldyc@sina.com¡¡Address:No. 16 Zhenxing Road, Dongtai Development Zone
Disclaimer: Part of the content of this website is from the Internet, if it unintentionally involves third-party intellectual property rights, please call or write to inform, this site will be timely response and improvement.
激情五月综合色婷婷一区二区_中文字幕一区二区三区在线不卡_欧美色在线精品视频欧美_av无码欧洲亚洲电影网

<i id="5pnlx"></i><u id="5pnlx"><video id="5pnlx"></video></u>

<i id="5pnlx"><video id="5pnlx"><ins id="5pnlx"></ins></video></i><i id="5pnlx"><video id="5pnlx"></video></i>

<acronym id="5pnlx"><video id="5pnlx"></video></acronym>

<i id="5pnlx"></i>